This project included the design and erection of a 410,000sf manufacturing plant including 120 ton bridge cranes, various capacity gantry and jib cranes, paint booth enclosure and a 3 story mezzanine office structure with opean terrace and patio. 

In addition to providing and erecting the structure, ADG provided BIM design and engineering support during the project. 

PEMB Cost: $22M; Total Project Cost: $285M