Komatsu Manufacturing Building
Milwaukee, WI
This project included the design and erection of a 410,000sf manufacturing plant including 120 ton bridge cranes, various capacity gantry and jib cranes, paint booth enclosure and a 3 story mezzanine office structure with opean terrace and patio.
In addition to providing and erecting the structure, ADG provided BIM design and engineering support during the project.
PEMB Cost: $22M; Total Project Cost: $285M
Expertise and Experience
We Can Do It All. Get In Touch For a Free Consultation
Aviation
Commercial
Environmetal
Industrial
Health Care
Sustainability
Federal Programs